Perfect World Rebellion
Welcome to Perfect World Rebellion Members Forum
The Move was successful
The Move was successful and is now fully complete. There was no data loss and all systems are now running normally Now is the time to click the PATCH button on the launcher and choose [EN] Patch - 2 if you missed the stage 1 patch, you may need to download the client again in full. however if you missed the 1st patch and dont want to download everything again, simply open your main PWR folder then open the Patcher folder, inside you will see another folder called "server" inside that is a text file called "updateserver.txt" open that and change the IPs inside so that it looks the same as this : "[EN]Patch-1" "http://185.251.226.160/CPW153/" "[EN]Patch-2" "http://185.251.226.160/CPW153/" this will then allow you to update to version 56 for connection to the new server. Thank you for your patience and support blessed be Hermod |
|
Írta: Hermod - Tuesday 02 October 2018 - 13:06:03 |
comment(s): 0 |
The Move
The machine move will take place on Tuesday 2nd October in the afternoon. The server will need to shut down whilst the move takes place. Server will therefore shut down at noon 12:00 UK Time and is planned to restart around 3pm, however if everything gets done sooner we will let you know and the server will reboot. There will be no data loss and no roll backs. Thank you for your patience with this and hope it goes smoothly. |
|
Írta: Hermod - Sunday 30 September 2018 - 16:46:36 |
comment(s): 0 |
We're Moving
Over the next 2 weeks, we will be moving the machine from it's current location to a new location and linking into a new Juniper 10GE network, being fed by numerous 10x10GE peers, so you will see an improved performance in network latency and response times as well as improved SLA and uptime guarantees. For us to do this move smoothly for you, it will be done in 2 stages. Stage 1 There will be a client side only update, this will provide you with a second option of "Update server". ![]() If you come to log in and cannot connect, you should check to see if the server is active. ![]() If you see it isn't online, check the message you get regarding the update connection. Stage 2 If you see this message ![]() Then it's time to select "[EN] Patch -2" shown in the image above. Once you select this it should then give you another patch (client side only) that will remove any references to our old IP location and once patched you will then be able to connect to and login to the machine as normal. We cannot as yet post the time or date of this move but will try to time it so that we are offline for as little time as possible. It "should" take us no more than an hour to complete the move of the machine. |
|
Írta: Hermod - Tuesday 25 September 2018 - 13:36:40 |
comment(s): 0 |